LNG Operations - Engine

High Voltage Related Questions of LNG Fleet

Questions for ETO position working with High Voltage PMS and switchgear. Highly recommended for LNG fleet ETO's. Switchboards, procedures, VCB, HV Contactors and Safety questions are waiting for you here.

Mga Tanong 10
Time Limit 5 min
Wika Ingles

Mga Sample na Tanong

Narito ang ilang halimbawang tanong mula sa quiz na ito. I-download ang GYRO app upang kunin ang buong pagsusulit.

Tanong 1

What is IGCT switching frequency?

A 500 Hz to 2 kHz
B 250 Hz to 500 Hz
C 1 kHz to 2 kHz
D 2 khz to 20 kHz

Tanong 2

Ground detection for each ungrounded system should have a monitoring and display system that has a lamp for each phase that is connected between the phase and the ground. True or False?

A True
B False

Tanong 3

The active guard sinewave filter converts the PWM wave form to a near sinusoidal wave form, protecting sensitive applications in the grid. True or False?

A True
B False

Tanong 4

After power loss...

A ... the backup generator must be started and connected to the main switchboard within 30 seconds, but no more than 45 seconds.
B ... the second st-by generator must be started and connected to the main switchboard within 30 seconds.
C ... the st-by generator must be started and connected to the main switchboard within 60 seconds.
D ... the backup generator must be started and connected to the main switchboard within 45 seconds, but no more than 60seconds.

Tanong 5

What are the key components of a high voltage circuit breaker?

A Contacts, coils, arc extinguishing chamber, and operating mechanism.
B Resistors, capacitors, and inductors.
C Semiconductors, diodes, and transistors.
D Sensors, actuators, and controllers.