प्रश्न 1

What is IGCT switching frequency?

A 500 Hz to 2 kHz
B 250 Hz to 500 Hz
C 1 kHz to 2 kHz
D 2 khz to 20 kHz

प्रश्न 2

Ground detection for each ungrounded system should have a monitoring and display system that has a lamp for each phase that is connected between the phase and the ground. True or False?

A True
B False

प्रश्न 3

The active guard sinewave filter converts the PWM wave form to a near sinusoidal wave form, protecting sensitive applications in the grid. True or False?

A True
B False

प्रश्न 4

After power loss...

A ... the backup generator must be started and connected to the main switchboard within 30 seconds, but no more than 45 seconds.
B ... the second st-by generator must be started and connected to the main switchboard within 30 seconds.
C ... the st-by generator must be started and connected to the main switchboard within 60 seconds.
D ... the backup generator must be started and connected to the main switchboard within 45 seconds, but no more than 60seconds.

प्रश्न 5

What are the key components of a high voltage circuit breaker?

A Contacts, coils, arc extinguishing chamber, and operating mechanism.
B Resistors, capacitors, and inductors.
C Semiconductors, diodes, and transistors.
D Sensors, actuators, and controllers.