प्रश्न 1

Shipboard power generation and distribution is mainly a three-phase three-wire ungrounded system. True or False?

A True
B False

प्रश्न 2

What is the main risk of using Shaft generators onboard modern LNGs?

A Sudden ME slowdowns.
B Frequency surges.
C Main Voltage drops.
D ME Overspeed.

प्रश्न 3

What should be inspected if a high voltage circuit breaker fails to close properly?

A The mechanical closing mechanism and the control circuit.
B The breaker’s insulation resistance.
C The power factor of the system.
D The temperature of the switchgear.

प्रश्न 4

What is transient recovery voltage (TRV)?

A Voltage that is applied across the contacts of a circuit breaker after current interruption.
B Voltage that is applied to a circuit to restore power after a breaker trips.
C Voltage drop across a circuit breaker while it is conducting normal load current.
D Constant voltage maintained by the system to protect the circuit breaker during operation.

प्रश्न 5

Choose Disadvantages of SF6 Circuit Breakers:

A More expensive than other types of breakers.
B Switching deposits restrict the number of operations before service/recondition.
C Generally limited to voltages of up to 6kV.
D Much bigger than other breakers.