Download App
Jack-Up Barge Operations

Jack-Up Basic Overview

This test will help you assess your knowledge of working on a Self Propelled Jack-Up barge, which is a crucial aspect when deciding to transition to this type of vessel and during interviews with shipowners.

Questions 20
Time Limit 9 min
Language English

Sample Questions

Here are some example questions from this quiz. Download the GYRO app to take the full test.

Question 1

What is the meaning of Pin Hole?

A Depression on top of sea bottom left after spud can of previous Jack-Up barge
B Hole into Spud can
C Hole into barge hull
D Location at sea bottom where we shall place Spud cans

Question 2

What actions can be taken to avoid risk associated with Ex-pin holes at new location?

A Ex-pin holes can be aligned with sea bottom by sand bags
B Spud Can can be installed inside Ex-pin hole
C Keep safe distance of one Spud can diameter to Ex-pin hole
D All mentioned

Question 3

When Jetting system should be used?

A When legs stuck inside sea bottom and need to release them
B When need to align sea bottom under the spud cans
C When need to speed up Jacking process speed
D When need to speed up les retrieve to home position

Question 4

Who decide which method utilize for legs pulling from deep penetration at self-propelled Jack-Up barge?

A Chief engineer (Jacking system operator)
B Master
C Master and Chief engineer (Jacking system operator) together taken into consideration prevailing circumstances
D Marine superintendent

Question 5

Look at the picture ant answer which type of the legs at this Jack-Up barge?

A Rack and Pinion tubular type
B Lattice type rack and pinion
C Pin and hole tubular type
D I don’t know