Slow Speed Engine – Operational Level (Junior Engineer)

Test designed for junior engineers working with two-stroke slow-speed main engines (e.g., MAN B&W, Wärtsilä RT-flex). Covers starting and control systems, fuel injection, cylinder lubrication, scavenge air system, cooling, and safety procedures.

Questions 60
Time Limit 59 min
Language English

Sample Questions

Here are some example questions from this quiz. Download the GYRO app to take the full test.

Question 1

What is the meaning of the abbreviation "RQ" at the end of a DSC sequence?

A Acknowledgment broadcast.
B Problem of transmission.
C Acknowledgement request.
D End of sequence.

Question 2

Which of these are indications that a parcel is suspicious?

A The parcel smells like chocolate.
B The parcel is wrapped in clean, brown paper and is addressed to a crewmember from his wife.
C The parcel is addressed to no one in particular, arrives unexpectedly and seems heavy for its size.
D The parcel came from Joe in the safety department and arrived quicker than expected.

Question 3

How many total frequencies are available for DSC distress alerting?

A Two (2).
B Seven (7).
C One (1).
D Five (5).

Question 4

When moving into an Emission Control Area for Sulphur, which of these is most important?

A That the change-over to low Sulphur fuel was started before entry into the ECA.
B That the change-over to low Sulphur fuel is started before arrival in port.
C That the change-over to low Sulphur fuel is complete before arrival in port.
D That low Sulphur fuel is actually being burned before entry into the ECA.

Question 5

What is a contingency plan for ships?

A Plan for maintenance and repair.
B Plan for safety preparedness.
C Loading plan for general cargo.
D Plan for next voyage.